About Water Services
Zaga Mall - Mechanical Room / Water Pumps, Date Taken: 20.Oct.2014
Rehabilitation Works in Al Hader Water Treatment
Rehabilitation Works in Al Hader Water Treatment
Zaga Mall - Mechanical Room / Water Pumps, Date Taken: 20.Oct.2014
Zaga Mall - Mechanical Room / Water Pumps, Date Taken: 20.Oct.2014
Zaga Mall – Air Handling Units / HVAC System
Zaga Mall – Water Pumps / HVAC System
Rehabilitation Works in Al Hader Water Treatment, Sedimentation Storage Tanks
Rehabilitation Works in Al Hader Water Treatment, Low Lifting Station Pumps
Rehabilitation Works in Al Hader Water Treatment, High Lifting Station Pumps
text
Water Treatment Plant 20 M3/hr – Nogharan Permanent Camp
Incinerator Size 50 m3/hr – Nogharan Permanent Camp
Fire Fighting Pump Station Capacity 750 GPM with Storage Tank 180 M3, Nogharan Permanent Camp
Power Generation 1.5 MW – Nogharan Permanent Camp
Al Hader Water Tretamet Plant – Water Compact Unit Size 250 M3/hr
© Copyright 2017 Zana Group. All rights reserved. Developed by Landvin.